Leeside Road, London

Case Study

Project Address

Leeside Road, N17 0QS

Services

Full design, supply, and installation of curtain walling systems, including protective elements and specialist components

Timeline

3 Months

Case Study: Curtain Wall Installation – Leeside Road, N17 0QS

Project Overview:

Location: Curtain Wall Installation – Leeside Road, N17 0QS

Project Duration: 3 months

Scope of Work: Full design, supply, and installation of curtain walling systems, including protective elements and specialist components.

Project Description:

The project involved the installation of a high-performance curtain wall system across the building’s 4-core ground floor and Level 1 areas. The works included:

  • Fabrication and installation of curtain wall units
  • Integration of spandrel panels/glass/fire barriers/louvres for fire safety and thermal performance
  • Installation of PAS 24–compliant louvres to enhance ventilation while maintaining security standards
  • On-site protection measures to maintain façade integrity during the construction period

Our responsibility covered the complete design, engineering, supply, and installation of the façade package.

Services Provided:

  1. Design & Engineering
    • Detailed façade design and structural calculations
    • Interface coordination with main contractor and other trades
  2. Supply
    • Procurement of curtain wall frames, glazing, spandrel panels, and PAS 24 louvres
    • Factory QA checks to ensure compliance with project specifications
  3. Installation
    • On-site fixing and alignment of curtain wall system
    • Integration of protection systems and finishing elements
    • Coordination with follow-on trades to maintain programme flow


Challenges Faced:

  1. Tight Programme Duration

The project required completion within a strict 3-month window, leaving limited buffer for design amendments, supply lead times, or site delays.

  1. Coordination Across Multiple Cores

Working on four separate building cores required careful planning and sequencing to avoid clashes with other trades and maintain safe site operations.

  1. Ensuring Compliance with High Security Standards

Integrating PAS 24–rated louvres into the curtain wall system required precise detailing and quality control to maintain both aesthetic and security specifications.

Results:

  • Project delivered on time, successfully meeting the accelerated programme.
  • Curtain wall system installed to specification, with full integration of spandrel panels and PAS 24 louvres.
  • High-quality façade finish achieved with no defects on handover.
  • Improved building performance in terms of safety, ventilation, and thermal efficiency.
  • Positive feedback received from the client for strong coordination and meeting the programme despite challenging conditions.

Our Case Studies

Service Inquiry
Our Services
  • Residential Construction
  • Commercial Construction
  • Structural Engineering
  • Land Development
  • Renovation and Remodeling
  • Interior Design and Finishing
Full-service offerings
Environmentally Conscious
Strong partnerships