Balcony decking, External Wall Cladding & Insulated System
3 Months
Project Overview:
Location: Canada Water, London, SE16 7DZ
Client: Barratts Developments Plc
Project Duration: 3 months
Scope of Work: Principle Contractor for Barratts Developments encompassing the design supple and installation of various structural and cladding systems
Project Description:
DMC acted as the principal contractor for an extensive project encompassing three blocks within the Canada Water development. Our responsibilities included the comprehensive design, supply, removal, and installation Non-combustible replacement materials, such as insulation systems, fire breaks, aluminium panels and decking.
For one of the buildings, Victoria House, DMC took on the critical task of compiling and submitting detailed documentation required by the Building Safety Regulator. Given the building’s height, this process was essential to meet stringent safety standards, ensuring full regulatory compliance before project completion. Our efforts aimed to secure both approval and peace of mind, adhering to the highest standards of safety and quality for all stakeholders involved
Services Provided:
External Wall Cladding System: Aesthetics, weather resistance and fire safety compliance are paramount in modern construction. DMC Walling was tasked with the installation of a high-quality external wall cladding system, guaranteeing the building’s visual appeal while providing robust protection against fire.
External Wall Insulated System: To enhance energy efficiency ,sustainability and ultimately fire performance. DMC Walling provided and installed an external wall insulated system. This not only improved the thermal performance and energy efficiency of the building but also contributed to ensuring the building is deemed safe and complaint in fire safety performance.
Challenges Faced:
With the introduction of a new regulator (Building safety regulator) The Building Safety Regulator (BSR) introduces challenges to projects through stringent compliance requirements, increased documentation demands, and rigorous inspections. The need for detailed safety cases, Golden Thread documentation, and adherence to Gateway reviews. These were all challenges DMC had to overcome to gain the ability to begin on the high rise building within the project.
Results: A fully compliant B1 rated residential building with EWS-1 certificates granted to all residents due to DMC’s remedial works.
Specialist contractor for SFS, rainscreen cladding, insulated render and curtain walling with a proven track record of delivering high-quality results across the UK