- Monday - Friday 8am-4pm
- 020 8803 0423
Kings Road Park,
Block E1,
SW6 2FR
DMC Walling provided a fully integrated design, supply and installation service, including Curtain Walling, Cladding Systems, Copings, Rainwater Pipe Systems, Main Entrances, Architectural Louvres and Sunray doors
November 2024 – June 2025 (6–8 months)
Project Overview: DMC Walling was appointed by St William Homes to deliver a complete, high-performance façade solution for the residential development at Kings Road Park, Phase 3 – Block E1. The project demanded precision engineering, seamless coordination, and exceptional finish quality to meet the architectural vision and performance requirements of a premium London development.
Location: Kings Road Park, Block E1, SW6 2FR
Project Duration: November 2024 – June 2025 (6–8 months)
Scope of Work: DMC Walling provided a fully integrated design, supply and installation service, including:
Project Description:
The project comprised the delivery of a high-quality building envelope solution, incorporating the design, manufacture, supply, and installation of a comprehensive range of façade and external envelope systems. DMC Walling provided an integrated service covering curtain walling, cladding systems, copings, rainwater pipe systems, main entrance assemblies, architectural louvres, and Sunray doors. The works were executed to meet the architectural intent, performance requirements, and durability standards, ensuring a cohesive, functional, and visually striking external façade.
Services Provided:
External Works:
From concept through to completion, DMC Walling took full ownership of the façade package, ensuring certainty in delivery, quality, and performance.
Challenges Faced:
Results:
Specialist contractor for SFS, rainscreen cladding, insulated render and curtain walling with a proven track record of delivering high-quality results across the UK